문제번호 | Question | Section |
1 | IPD정의 | 9.3.5 |
2 | Tensile Test Requirments | 5.6.2.3 |
3 | Film 저장방법 | 11.1.9.1 |
4 | Welder Qualification 시편개수 | Table 3 |
5 | Company rejection right | 9.2 |
6 | Automatic welding procedure spec. information | 12.4.2 |
7 | Crown surface 높이(1/16") | 7.8.2 |
8 | Shielding gases 종류 | 4.2.3.1 |
9 | Defect제거시 제거방법(entiely from sound metal ?) | 10 |
10 | film images are interpretable for at least 3years | 11.1.11 |
11 | Filler metal Group(E7016 -> E9018) | Table 1 |
12 | Fillet welds test requirements(gas pocket) | 5.8.3 |
13 | Nde personnel Recertified | 8.4.2 |
14 | Welder Qualification (Prior to ~ | 6.1 |
20 | Shielding gases Storage and Handling | 4.2.3.2 |
38 | Procedure specification informaion | 5.3.2 |
27 | Procedure specification essential variables | 5.4.2 |
34 | Procedure specification essential variables | 5.4.2 |
36 | Filler metal Group(E7010 -> E7018)Requalfication | Table 1 |
41 | Tensile Test specimens Preparation | 5.6.2.1 |
29 | Procedure qualification test 시편개수 (OD10.5", T 05.") | Table 2 |
44 | Fillet welds test preparation | 5.8.1 |
24 | Multiple qualification test(OD 6.5") essential variable | 6.3.2 |
46 | The surface to be welded shall ~ (scale 이 문제에 나옴) | 7.1 |
26 | Field bevel | 7.4.2 |
32 | When the pipe is welded above ground~ 16" | 7.6 |
19 | The face of the completed~ 1/8" | 7.8.2 |
16 | Preheat - procedure specification shall specify | 7.11 |
40 | Inspection personnel documentation a, b, c | 8.3 |
18 | Nonestructive personnel procedure | 8.4.1 |
23 | IP individual exceeds 1" | 9.3.1.a |
42 | IC 합격기준 | 9.3.6 |
23 | ISI 합격기준 aggregate length in 12" - 1/2" | 9.3.8.2.d |
25 | HB 합격기준 | 9.3.9.4 |
15 | Cracks may be ~ 8% | 10.1.1 |
23 | Crack 수정기준(???????) | 10.1.1 |
43 | 결함수정 방법(without prior company authorization) | 10.1.2 |
39 | Repaired areas shall be ~ | 10.3.1 |
21 | A copy of the record shall be furnished ~ | 11.1.2.1 |
37 | Film radiography details | 11.1.2.2 |
45 | whenever more ~ (identification markers) ~ (overlap) | 11.1.8 |
30 | The radiographer shall be responsible for ~ | 11.1.13 |
반응형
'자격증 > CWI,CSWIP' 카테고리의 다른 글
PART B 기출문제 (0) | 2016.03.12 |
---|---|
2011년 PART C(API 1104) 문제 유형 (0) | 2016.02.01 |
2011년 CWI PART B 기출문제 (0) | 2016.02.01 |
Part A-2 (0) | 2016.02.01 |
part A-1 (0) | 2016.02.01 |